Products
PRODUCTS DETAILS
Home > Products >
Q355B Large Diameter Welded Steel Tube Column CHS for High Rise Steel Frame Building

Q355B Large Diameter Welded Steel Tube Column CHS for High Rise Steel Frame Building

MOQ: 1 PCS/20 Tons
Price: $1300-3000
Standard Packaging: Customized based on project
Delivery Period: 30-60 Days
Payment Method: D/A,D/P,T/T,L/C
Supply Capacity: 15,000 t / month
Detail Information
Place of Origin
Chengdu , China
Brand Name
Sichuan Shunyao Supply Chain Management Co., Ltd.
Certification
CE,ISO
Connection Type:
Bolts
Insulation Options:
EPS, Glasswool, Rockwool, PU
Welding Standard:
AWS D1.1
Structuretype:
Steel Frame
Service Life:
50+ Years
Thickness Of Panel:
50mm, 75mm, 100mm, 150mm, 200mm, 250mm
Panel Thickness:
50mm, 75mm, 100mm, 150mm, 200mm, 250mm
Design Load:
Wind, Snow, Seismic
Productname:
Steel Frame Building
Flange Width:
50-300mm
Raw Steel Material:
Q235B, Q355B, ASTM A36
Environmentalimpact:
Recyclable And Sustainable Materials
Seismicresistance:
Engineered To Meet Local Seismic Codes
Crane:
Without Or From 1Ton ~300Ton
Spanwidth:
Up To 60 Meters
Highlight:

Q355B Steel Tube Column

,

Large Diameter CHS Column

,

Welded Steel Tube Column

Product Description

Large diameter steel tube columns — rolled, welded and concrete-filled. Diameter 400–2,000 mm, wall 8–60 mm, Q355B, supplied as CHS or CFST.

  • 400–2,000 mmDiameter range
  • 8–60 mmWall thickness
  • Q355BSteel grade
  • CHS / CFSTSection type

A steel tube column behaves the same in every direction. That single property is why it is used where wind or seismic load can come from anywhere, and why it looks right when the structure is left exposed. Making one is a different problem from making an H-column, and the difference starts at the plate.

Why a Tube — and When It Is the Wrong Choice

A steel tube column has the same second moment of area about every axis through its centre, so it does not have a weak direction. In torsion, a closed section is far stiffer than an open one, which matters on a slender column under eccentric load.

It is also the most efficient shape for a given perimeter, which is why it wins on exposed structures where the surface is the cost.

What it loses is connection simplicity. An H-column takes a bolted end plate, a cleat or a simple seated connection with no fabrication. A tube needs a machined end, a flange ring, or a profiled joint — and that work is where the cost sits.

How a Large Tube Is Actually Made

Large diameter steel tube columns are not bent on a pipe bender. A pipe bender forms small tube; a structural column of 800 mm diameter starts as a flat plate.

  1. Plate preparation. Plate is cut to the developed width, with the longitudinal edges bevelled for a full-penetration seam.
  2. Rolling. The plate is rolled into a cylinder on a three-roll or four-roll machine, with the ends pre-bent so the seam closes without a flat spot.
  3. Longitudinal seam. Submerged arc welding, inside and outside, with the seam rotated to the flat position.
  4. Re-rounding. After welding the tube is mechanically re-rounded, because the seam contraction makes it oval.
  5. Circumferential splices. Where the column is longer than a plate, sections are joined with a circumferential weld, aligned on a fitting jig.
  6. End machining. Both ends are machined square and flat, so the column bears on its base plate across the full section.

Seamless and spiral-welded pipe are the other two sources. Seamless is limited in diameter and wall; spiral pipe is common for piles and less common for architectural columns.

D/t and Roundness Decide Whether the Column Works

A steel tube column has two failure modes that an H-column does not have in the same way. The first is local buckling: if the wall is thin relative to the diameter, the tube dents before the column as a whole buckles, and the calculated capacity is never reached. The diameter-to-thickness ratio is the number that controls it, and every code sets its own limit.

The second is out-of-roundness. A tube that is oval has a lower section modulus than the nominal section, and the loss is not obvious on site. Both roundness and straightness are measured and reported against the execution standard — EN 1090-2 or GB 50205 — not against what the shop is used to.

Joints: Where Tube Structures Are Won or Lost

A tube-to-tube joint is cut on a profile, not with a square saw. The brace end follows a saddle curve that depends on the diameter ratio and the angle, and it is cut on a CNC pipe profiling machine. A joint cut by hand and dressed with a grinder leaves a gap that no amount of weld will close properly.

Where a beam meets a column, the usual details are a through-plate, an internal ring stiffener, or an external flange ring. Each has a different fatigue behaviour, and the choice is usually made by the designer — but it has to be buildable. An internal ring that cannot be welded from the outside is a design that cannot be fabricated.

Concrete-Filled Tubes (CFST)

Filling the tube with concrete changes three things at once: stiffness goes up, fire resistance improves because the concrete absorbs heat and the steel is protected from within, and the section can be smaller for the same load.

It also adds a site process. The tube needs vent holes at the top and a filling point at the bottom, the concrete has to be pumped or poured without voids, and the mix has to flow — self-compacting concrete is normal. The steel is inspected before filling and not after.

If CFST is intended, say so at enquiry stage. The vent and filling details belong on the fabrication drawing, not on a site instruction.

Welding, Inspection and What to Specify

Longitudinal seams are submerged arc, welded both sides. Circumferential splices are welded with the procedure qualified for the wall thickness, and where the column is a primary member the seam and the splice are ultrasonically tested.

Specify the execution standard, the weld quality level, the NDT percentage and the certificate grade at enquiry stage. A tube column that meets one standard is not automatically acceptable under another, and the argument usually happens after the steel has been painted.

Transport and Site Splices

Diameter, not length, usually governs. A steel tube column of 1.5 m travels as break-bulk or on an open-top; a 2 m tube ships on deck with the ends capped. Columns longer than about 12 m are spliced, and the splice position is set by the transport route rather than by the structure.

Site splices are either bolted flange connections or welded. Bolted is faster and needs no site welder; welded is cheaper in steel and needs a qualified procedure on site. Decide before the drawings are issued.

What We Need to Quote
Dimensions Diameter, wall thickness and length, per column mark
Grade & standard Q355B, S355JR, with the execution standard
Section type CHS or CFST, and the concrete grade if filled
End condition Machined flat, flange, or profiled joint
Joint details Through-plate, internal ring, external ring
Weld quality Weld quality level and NDT percentage
Surface Primed, galvanized, or fire protection system
Site connection Bolted or welded

Send these and we return the fabrication drawing, the weight and a quotation.

Frequently Asked Questions
What is the largest diameter you can roll?

It depends on the plate width and the roll capacity, not on a catalogue limit. Send the diameter, wall and length and we will confirm against the machine before quoting.

Is a steel tube column stronger than an H-column?

For the same weight, a tube is usually better in torsion and equal or better in compression, and it has no weak axis. An H-column is cheaper to connect and easier to fire-protect. The right answer depends on the connection, not on the section alone.

What is D/t and why does it matter?

The ratio of diameter to wall thickness. A high ratio means the wall buckles locally before the column fails as a whole, so the full calculated capacity is never reached. Every code limits it, and the limit changes with the steel grade.

Can the column be concrete-filled?

Yes. CFST improves stiffness and fire resistance and allows a smaller section. It needs vent holes, a filling point and a self-compacting mix, all detailed before fabrication.

How are tube-to-tube joints made?

The brace end is cut on a CNC pipe profiling machine to a saddle curve that matches the chord diameter and the angle. Hand cutting and grinding leaves a gap that the weld cannot close properly.

How is a 2 m diameter column shipped?

As break-bulk or on deck, with the ends capped and the bore protected. Diameter, not length, is what sets the shipping cost.

Can it be galvanized?

Yes, with vent and drain holes at the design stage. For a sealed tube the air inside has to escape during dipping, and a closed column can be dangerous to galvanize.

Ready to quote. Send the column marks, the diameters and the joint details. We return the fabrication drawing, the weight and a quotation.