A T-section steel member places the web on the centre line and leaves a flat face on top. That flat face is the reason it exists: where an H-beam would put steel on the wrong side of the fixing, a T-section sits flat against the plate, the deck or the rail. There are three ways to make one, and they are not interchangeable.
The choice is usually decided by quantity rather than preference. Under a few tonnes, splitting wins. Above that, a mill order or a welded assembly starts to make sense.
Two dimensions do the work. The flange width controls local buckling and the spacing of the fixings; the web depth controls bending capacity. A split T inherits both from its parent H-beam, so the parent decides the result.
For the same mass, a T-section bends less efficiently about its strong axis than the H-section it came from, because the neutral axis has moved. What it buys is a flat face and a single web — which is worth more than the lost capacity when the member has to sit on something.
Start from the load and the span, then pick the series. If nothing in TW / TM / TN fits, a welded T is the next step, not a heavier split section.
Dimensional tolerance follows GB/T 11263, or EN 10034 where the project names a European standard. Three things matter more on a T than on an H:
Standard grades for T-section steel are Q235B and Q355B, with Q355C and Q355D for low-temperature service; S235JR and S355JR are the EN 10025 equivalents. Surface is either shot blasted to Sa2.5 and primed, or hot-dip galvanized where the member is exposed or the site is coastal.
Tell us which one at enquiry stage. Galvanizing a split T after cutting leaves the cut face coated, which is what you want; galvanizing before cutting leaves bare steel on the exposed edge.
Standard delivery is 6 m to 12 m, cut to length on request. Bundles are banded and packed for sea freight; lengths over 12 m ship as break-bulk or on a flat rack. We mark each bundle against the packing list so the site can unload without opening everything.
| Section | TW / TM / TN designation, or a drawing with flange and web dimensions |
|---|---|
| Grade and standard | Q235B, Q355B, S235JR, S355JR |
| Quantity | In tonnes, and length per piece |
| Route | Hot-rolled, split, or welded |
| Surface | Primed or galvanized |
| Tolerance & NDT | Tolerance and any NDT requirement |
Send these and we return the section schedule, the weight and a quotation.
A split T is cut from an H-beam, so it is cheaper for small quantities and available in any size the parent beam comes in. A hot-rolled T has a cleaner surface, no cut edge and better fatigue behaviour, but the sizes are fixed by GB/T 11263 and it needs a mill order.
Yes. Splitting is done on a band saw or a plasma line, one H-section into two T-sections, with the cut face dressed afterwards. It is the usual route for orders under a few tonnes.
12 m in a container. Longer members ship as break-bulk or on a flat rack, and we weld or splice to the length the drawing calls for.
Q235B for general framing, Q355B where the member is loaded or the span is long. Q355C or Q355D where the service temperature drops below zero.
Yes, hot-dip galvanized to the coating thickness the exposure requires. For a split T, we galvanize after cutting so the cut face is covered.
Yes, where the project names a European standard. Say so at enquiry stage, because the dimensional check and the mill certificate follow that standard rather than GB/T 11263.
One tonne for standard sections. Below that, a split T from stock H-beam is usually still workable — ask.