| MOQ: | 1 PCS/20 Tons |
| Price: | $1300-3000 |
| Standard Packaging: | Customized based on project |
| Delivery Period: | 30-60 Days |
| Payment Method: | L/C,D/A,D/P,T/T |
| Supply Capacity: | 15,000 t / month |
A column-free steel warehouse with a clear span of up to 40 m removes internal columns entirely, turning the whole floor into usable, racking-ready space. Built with Q235B / Q355B steel and A572 Gr.50 channels in a bolted frame, it is engineered for distribution, logistics, and any operation where the layout must stay flexible.
In a column-free warehouse, a column is a cost you pay twice: once to build, and once every day — in the aisle that has to go around it and the racking bay that cannot be where the layout wants it. A clear span of 30 m to 40 m removes the internal columns altogether, and the whole floor becomes usable.
Those four points are why a clear span is worth paying for in a distribution building. They are not worth paying for in a building that only stores pallets against the walls.
In a column-free warehouse the rafter spans 40 m, and that is not a 20 m rafter made longer. The bending moment rises with the square of the span, so the section depth and the steel weight per square metre climb steeply after about 30 m.
Three consequences follow, and they should be priced in from the start:
A supplier who quotes a 40 m building at the 20 m rate per square metre has either misread the drawing or intends to change the section later.
At long spans the purlins and secondary members stop being minor items. Where the design calls for it, we use American standard channels to ASTM A572 Gr.50 — for example C9×134, a 9 inch channel at 134 lb/ft — as high-capacity members, with C and Z purlins in Q235B elsewhere, and knee braces, tie tubes and round-bar bracing completing the system.
We quote weights per metre on the sections we propose, so the freight and customs figures are known before the order rather than after.
Distribution and logistics buildings are the main case. It also suits dust-controlled workshops, ESD-controlled assembly areas, food and chemical processing halls, heavy industry and high-voltage plant buildings, and research facilities — anywhere the floor has to stay free of obstruction or the internal layout has to remain flexible.
Steel is the right material at this span, but three things have to be specified rather than assumed.
| Consideration | Requirement |
|---|---|
| Fire | Bare steel loses strength when hot. Where the code requires a period of fire resistance, the columns and rafters need a coating or a board — a real cost per square metre of surface. |
| Corrosion | Humid, coastal or chemical sites need a proper coating system or galvanizing, not a thin paint film. The coating is chosen for the corrosivity category, and the thickness is specified as a number. |
| Low temperature | Cold sites need a grade with tested impact toughness — S355J2 rather than S355JR — and that has to be decided before the mill order, not after. |
We raise these at quotation stage. If the site is coastal or very cold, say so at the start and the specification changes accordingly.
Members are supplied cut to length and drilled to the shop drawing, with the rafter splices, base plates and purlin cleats already in place. Site work becomes bolting rather than fabrication, which matters when the erection crew is small and the weather window is short.
Send these and we return the column grid, the section sizes, the weight and a quotation.
40 m with a portal frame and a deeper rafter. Beyond that a truss or a multi-span arrangement with an internal column is usually cheaper than a heavier single span.
Per square metre, yes — the rafter is deeper and the foundation carries more load at fewer points. Whether it is worth it depends on the racking layout and the handling speed, which is what the clear span is buying.
Yes, if the end frame is designed for it. Tell us at enquiry stage and the columns, foundation and cladding junction are detailed for a future bay.
Not as a standard clear-span warehouse. A crane needs a runway beam, heavier columns and a fatigue check, which is a different structural system — see the crane beam workshop page.
In two pieces, spliced at a designed point with a bolted end-plate connection, shipped in 40 ft open-top containers or as break-bulk. The splice position is set with the transport route.
No. We design the building around the racking layout you provide. Sending the racking drawing at enquiry stage is the fastest way to get a column grid that works.
Columns and rafters are protected to the rating your code requires, with intumescent coating or board. We issue the member schedule and the required thickness for approval before production.
Send the span, the clear height and the racking layout for your column-free warehouse. We return the column grid, the section sizes and a quotation.