| MOQ: | 1 PCS/20 Tons |
| Price: | $1300-3000 |
| Standard Packaging: | Sea-worthy bundles; main frames and crane beams in 40 ft open-top |
| Delivery Period: | 30-60 Days |
| Payment Method: | L/C,D/A,D/P,T/T |
| Supply Capacity: | 15,000 t / month |
A single-storey warehouse and a six-storey steel office building are both steel frames — and almost nothing else about them is the same. Once a steel office building goes above two floors, three factors take over the design: how it resists sideways load, what the floor is made of, and how the steel is protected from fire. These three decisions drive cost long before the cladding does.
A portal frame in a warehouse resists wind through frame action, and the column bases can be pinned. A steel office building cannot work that way: the sway at each floor must stay within a limit, and that limit usually forces a deliberate structural system.
There are two main options, and the choice is architectural as much as structural.
Most office buildings use a mixed system: a braced core plus a moment frame at the perimeter. The key point for a buyer is that this decision must be made with the architect, not after the tender.
In an office, the floor is what people experience. Three things have to be right, and only one of them is strength.
This is why a steel office is priced by the floor system rather than by the tonne of frame.
A steel office building is a regulated building. The structure has to hold its strength for a defined period — commonly 60 to 120 minutes depending on height and code — and that protection is applied to every exposed steel surface.
On a six-storey building the protected surface area is large, and the cost is real: intumescent coating is priced by surface area and film thickness, while board is priced by square metre plus labour. There are two ways to reduce it, both decided at design stage: conceal the beams inside a ceiling, or use concrete-filled sections where the code allows.
A quotation that excludes fire protection is not a building quotation. Ask what period is assumed and what system is priced.
Structural steel is already recovered at close to 100% at end of life, so a headline figure like "95% recyclable" is not a differentiator — it invites the question of what the other 5% is.
The defensible environmental argument for a steel office is different, and better: dry construction with less wet trade and less site waste, a frame that can be dismantled and reused rather than demolished, and a lighter structure that reduces the foundation. Those are measurable. A percentage on the banner is not.
Each column splice carries a small permitted deviation. Over six floors those accumulate, and a building that is within tolerance on every storey can still be out of plumb overall.
So verticality is surveyed for the whole frame, not per level, and the splice details are set so the error can be corrected at each lift rather than at the top. This is one of the reasons a multi-storey frame is trial-assembled in segments before shipping.
| Parameter | Details Required |
|---|---|
| Building height | Number of floors, floor-to-floor height, and total height |
| Plan & span | Plan dimensions, and the clear span required for the office layout |
| Floor system | Composite deck, precast, or steel deck with dry board |
| Loading | Live load, and any special equipment or filing load |
| Lateral system | Braced, moment frame, or mixed |
| Fire resistance | Required period, and the code it comes from |
| Site conditions | Wind, snow, seismic loads; and the execution standard |
Send these details and we will return the frame layout, the floor system, the section sizes and a quotation.
Comfortably two to eight with an H-section frame, which is the usual range for a low-rise office, school or clinic. Above that, the lateral system and the lift core start to govern, and the design changes character.
For low-rise buildings on good ground, usually — the frame is lighter, the foundation is smaller, and the programme is shorter. The comparison flips where fire protection is extensive or where local concrete is very cheap.
Normally a profiled steel deck with shear studs and in-situ concrete. Precast planks are an alternative where the local supply is good and the crane can lift them.
Intumescent coating or board to the period the code requires, priced by protected surface area. Concealing the beams in a ceiling reduces it; this has to be decided with the architect.
Only if the columns, foundation and lateral system were designed for the extra floors at the start. Adding storeys to a frame designed for four is usually not feasible.
No. We supply the structural frame, the floor deck, the roof and wall envelope and the stairs. Lifts, MEP and internal finishes are by others, and we coordinate the interfaces.
Structural steel is recovered at close to 100% at end of life, so the figure is not a meaningful differentiator. The real advantages are dry construction, less site waste, and a frame that can be dismantled.
Send the floor count, the plan and the fire period for your steel office building. We will return the frame layout, the floor system and a quotation.