| MOQ: | 1 PCS/20 Tons |
| Price: | $1300-3000 |
| Standard Packaging: | Customized based on project |
| Delivery Period: | 30-60 Days |
| Payment Method: | L/C,D/A,D/P,T/T |
| Supply Capacity: | 15,000 t / month |
Buying an H-beam is not one decision — it is three. Which designation you need, whether that size is on a shelf or has to be rolled, and what has to happen to it before it leaves: cut, drilled, blasted, primed. Most suppliers quote the first and leave the other two to the small print. This page sets out all three, because the second and third are where a project actually loses time.
Supplied to GB, EN and ASTM standards in grades Q235B and Q355B, in 6–12 m lengths or cut to your list, with an EN 10204 3.1 mill certificate.
Hot-rolled H-beams in the three designation systems an export project is likely to specify:
Grades run from Q235B and Q355B to S235JR, S355JR and S355J2, and to A36 or A572 Gr.50 where the drawing is American.
If you are not sure which of the three your drawing uses, the difference is in the designation rather than the steel. A short guide to reading HW, HEB and W is available on a separate page — it saves a round of emails before the quotation.
This is the first question to settle, because it decides the programme.
A supplier who quotes without telling you which of the three applies is quoting a number, not a delivery.
Cutting an H-beam is done on a band saw or a plasma line, to a length tolerance agreed at order stage. Drilling is CNC from your shop drawing, so the holes match the drawing rather than a tape measure — which matters when the beam has to line up with a column that is already fabricated.
Surface is either mill finish, shot blasted to Sa2.5 and primed, or hot-dip galvanized. Say which at enquiry stage: blasting and priming add a few days, and galvanizing adds both time and handling, because the bundle has to be broken and re-bundled.
Q235B and S235JR are the general-purpose grades. Q355B and S355JR are the structural ones, both impact-tested at 20 °C. Above that, S355J2 is the grade to specify where the service temperature drops below zero — the J2 suffix is a 27 J impact test at −20 °C, and it is not interchangeable with J0.
Equivalent grades are not identical grades. Q355B and S355JR are close enough for many designs, but they are certified under different standards, with different sampling and tolerance rules. A substitution needs the engineer's signature, not the buyer's.
Structural steel ships with an EN 10204 3.1 mill certificate, tied to the heat number and to the bundle. That is what a fabricator needs to keep his own traceability chain intact, and what a client's inspector will ask for first.
A 2.2 certificate is a statement of compliance, not test results. It is acceptable for secondary members and not for a primary frame. If the project requires third-party inspection, SGS or BV can attend at the mill or at our yard.
H-beam bundles are banded by size, and each carries its heat number and its packing-list mark.
12 m lengths travel in a 40 ft open-top; 6 m lengths fit a high-cube. Anything longer is break-bulk.
| Designation and standard | HW / HM / HN, IPE / HEB / HP, or W, with the standard |
|---|---|
| Grade and impact requirement | Q355B, S355JR, S355J2 |
| Quantity and lengths | Quantity in tonnes, and the length list |
| Route | Stock, cut to length, or mill order |
| Cutting and drilling | Lengths, hole pattern, or the shop drawing |
| Surface | Mill finish, blasted and primed, or galvanized |
| Certificate and inspection | Certificate and any third-party inspection |
Send the list and we return the weights, the cutting plan, the bundle weights and a quotation.
Both. Standard sizes are held in the yard in 12 m lengths; sizes outside the standard series, or a low-temperature grade, are rolled to order at a minimum tonnage.
Yes, on a band saw or plasma line, to an agreed tolerance. Send the length list and we return a cutting plan that shows the waste.
The impact test temperature. JR is tested at 20 °C, J2 at −20 °C, both at 27 J. For a cold-climate site, J2 is the one to specify.
Often in practice, but not automatically. The nominal yield and the 20 °C impact are comparable; the certification route and the tolerance standard are not. The substitution needs approval against the design standard.
EN 10204 3.1, tied to the heat number and the bundle. Third-party inspection by SGS or BV can be arranged.
Banded bundles by size, each marked with its heat number and packing-list number. 12 m in a 40 ft open-top, 6 m in a high-cube.
One tonne for stock sizes. Mill orders carry a mill minimum, which we confirm against the size and grade before quoting.
Send the section list, the grades and the lengths. We return the weights, the cutting plan and a quotation.