| MOQ: | 1 PCS/20 Tons |
| Price: | $1300-3000 |
| Standard Packaging: | Customized based on project |
| Delivery Period: | 30-60 Days |
| Payment Method: | L/C,D/A,D/P,T/T |
| Supply Capacity: | 15000 Tons |
A clear-span steel warehouse with no columns in the storage area — up to 40 m. Forklifts move in straight lines, racking goes where the floor plan needs it, and the whole floor is usable. Frames are welded H-section steel, fabricated to your drawing and bolted together on site.
Columns cost money twice: once to build, and every day afterwards in lost storage space and slower handling. A 40 m clear span removes the internal columns altogether, so:
Main frame: welded H-section steel columns and beams in Q235B or Q355B. Section depth grows with the span, so a 40 m rafter is a substantially heavier member than a 20 m one. We size the frame from your loads rather than from a stock template.
At long spans the secondary framing does real work:
We quote weights per metre on the sections we propose, so the freight and customs figures are known before the order, not after.
Cladding: steel sheet or sandwich panel — EPS, PU, glass wool or rock wool.
Doors: sandwich panel sliding door or rolling metal door.
Windows: aluminum alloy or PVC panel window.
Steel frames have limits, and long spans are where they show:
We raise these at quotation stage rather than after delivery. If your site is high-corrosion or very cold, say so at the start and the specification changes accordingly.
Members can be supplied cut and drilled to drawing, so work on site is assembly rather than fabrication. Cutting and drilling are quoted as part of the package.
Design is free. Send these and we return a drawing and a price.
Large orders ship in bulk; smaller orders are packed with steel strip. A 20ft container takes about 25 tons and a 40ft container about 26 tons, so loading is planned against tonnage, not volume alone. Standard frames can ship quickly; fabricated project buildings run 30-60 days from approved drawings.
| Item | Specification |
|---|---|
| Product | Column-free steel storage workshop / warehouse |
| Clear span | Up to 40 m, no internal columns |
| Main frame | Welded H-section steel columns and beams, Q235B / Q355B |
| High-capacity members | American standard channels to ASTM A572 Gr.50, e.g. C9×134 |
| Purlins | C and Z sections, Q235B |
| Bracing | Knee braces, tie tubes, round bar; angle / bar / pipe vertical and horizontal support |
| Roof / wall cladding | Steel sheet or sandwich panel (EPS / PU / glass wool / rock wool) |
| Doors | Sandwich panel sliding door or rolling metal door |
| Windows | Aluminum alloy or PVC panel window |
| Additional service | Cutting and drilling to drawing |
| Standards | GB, ASTM, AISI |
| Warranty | 2 years |
| Lead time | Standard frames fast; project buildings 30-60 days |
| Packing | Bulk (large orders) or steel strip; 20ft ≈ 25 t, 40ft ≈ 26 t |
| Payment | 30% T/T advance + 70% balance |
| MOQ | From 1 ton / 5 m² (reference page values differ) |
| Production capacity | 15,000 tons / month |
| Place of origin | Chengdu, Sichuan, China |
| HS Code | 7308900000 |
Up to 40 m with no internal columns. Longer spans are possible with a different structural system — ask us and we will tell you honestly which system suits.
Storage density and handling speed. No columns means racking can be laid out to the plan and forklifts travel in straight lines.
Q235B or Q355B for the main frame, with ASTM A572 Gr.50 channels where higher capacity is needed. Standard: GB, ASTM or AISI.
The specification changes. Coastal and chemical sites get galvanizing or a heavier coating system; cold sites get steel with tested low-temperature impact toughness.
Yes. Cutting and drilling are part of the package, so site work is assembly rather than fabrication.
Bulk for large orders, steel strip for smaller ones. A 20ft container takes about 25 tons and a 40ft about 26 tons.