Products
PRODUCTS DETAILS
Home > Products >
Steel Workshop Building with Turnkey Contract Fire-resistant Materials and Crane Beam System

Steel Workshop Building with Turnkey Contract Fire-resistant Materials and Crane Beam System

MOQ: 1 PCS/20 Tons
Price: $1300-3000
Standard Packaging: Customized based on project
Delivery Period: 30-60 Days
Payment Method: L/C,D/A,D/P,T/T
Supply Capacity: 15000 Tons
Detail Information
Place of Origin
Chengdu , China
Brand Name
Sichuan Shunyao Supply Chain Management Co., Ltd.
Certification
CE,ISO
Surface Treament:
Painted / Hot Dip Galvanized
Application Fields:
Building
Knee Brace:
Angle Steel
Fireresistance:
Fire-resistant Materials Used
Roofing:
Sandwich Panel. Single Steel Sheet
Crane Compatibility:
Crane Beam System Can Be Pre-installed
Cladding:
PU/Rock Wool/Fiberglass/EPS
Toughness:
Good Toughness
Span:
10m - 40m
Grade:
Q235/Q345B
Rain Spout:
PVC
Snow Load:
0.5-1.0KN/m²
Insulation:
Optional
Visit:
Workshop Visit And Check Available
Use:
Wareshouse
Steel Grade:
Q235/Q345B
Surface Treatment:
Painted / Hot Dip Galvanized
Highlight:

Turnkey Steel Workshop Building

,

Crane Beam System Steel Workshop Building

,

Fire-resistant Steel Workshop Building

Product Description
Turnkey Steel Structure Workshop Contractor
Turnkey Steel Structure Workshop Projects

A turnkey steel structure workshop project: we design it, fabricate it, ship it and erect it. You provide the site and the civil works; we hand over a finished building. This page sets out what is in scope, what is not, and what we need from you to quote.

What Turnkey Means on a Steel Workshop

In a turnkey contract, one party is responsible for the whole job. On a steel workshop that covers:

  • Design and structural drawings
  • Steel fabrication and surface treatment
  • Roof and wall cladding, doors, windows and accessories
  • Container loading and shipping
  • Erection on site, by our crew or with our supervision

What is not included: land, foundation civil works, site utilities, permits and local labour accommodation. We say this plainly at quotation stage. Unclear scope is what turns an overseas steel project into a dispute.

Steel structure workshop construction site showing frame erection
Design

Design is free, and it comes with the drawings a builder actually needs: plan, elevations, sections, foundation drawing and installation drawings.

If the project needs calculations stamped by an engineer registered in your country, we work with your engineer and supply the inputs and the section properties they need. Better to divide that task honestly than to promise a stamp we cannot provide.

Technical engineering drawings and design plans for steel structure
Fabrication and Steel

Main frame: welded H-section steel or steel truss.

Steel grades, by standard: Q235, Q355, A36, A572 Grade 50, A992, S235JR, S355JR, S460NL.

Secondary frame: purlins (C / Z), angle braces, tie rods, vertical and horizontal bracing.

Roof and wall: EPS, glass fibre, rock wool or PU sandwich panel, or corrugated steel sheet.

Accessories: aluminum, PVC or sandwich panel windows; sliding, rolling or personnel doors; galvanized gutter with PVC downpipe; anchor bolts, high-strength bolts, screws, sealant, fans and skylight panels.

Sections We Can Source

Beyond the main frame, a workshop project usually needs a spread of sections. We supply:

  • European I-beams: IPE and IPN series, for example IPN 340
  • European H sections: HEA, HEB, HEM
  • Channels: UPN, UPE

Sections come cut to length, and we quote weights per metre so freight and customs figures can be checked before the order goes out -- not discovered when the bill lands.

Shipping

Frames go on steel pallets inside containers; panels are film-wrapped; fixings, plates and bolts are boxed and listed. Loading plans are prepared for the project, not for individual containers, so the order of arrival matches the order of erection on site.

Erection

Where the client wants it, we send an erection team, and we have built steel structures outside China. Where the client prefers a local contractor, we supply the drawings, an assembly sequence and technical supervision on site.

Either way one thing does not change: the frame has to go up the way it was designed, and our engineer stays accountable for that.

Timeline

Lead time is 30 days from deposit, subject to quantity and panel types. Erection follows the site programme. A single-storey workshop goes up in weeks, not months, once the foundation is ready and the containers are on site.

What We Need From You
  1. Site -- country, city, and conditions (coastal, seismic, snow)
  2. Building use and size -- length * width * eave height, and storeys
  3. Loads -- wind, snow and seismic; crane tonnage if there is one
  4. Steel standard and grade
  5. Scope -- supply only, or supply and erect
  6. Roof and wall -- panel type and thickness
  7. Doors, windows, ventilation and skylights
  8. Programme -- when you need it on site

Send the eight points and you get a scope note, drawings and a price.

Specifications
Item Specification
Service Turnkey steel structure workshop -- design, fabrication, shipping, erection
Building type Single-storey workshop / warehouse; multi-storey on request
Main frame Welded H-section steel or steel truss
Steel grades Q235, Q355, A36, A572 Gr.50, A992, S235JR, S355JR, S460NL
Secondary frame C / Z purlins, V angle braces, tie rods, vertical & horizontal bracing
Roof / wall panel EPS / glass fibre / rock wool / PU sandwich panel, or corrugated steel sheet
Section range IPE, IPN (e.g. IPN 340), HEA, HEB, HEM, UPN, UPE -- cut to length
Windows / Doors Aluminum, PVC or sandwich panel window; sliding / rolling / personnel door
Gutter / Downpipe Galvanized gutter + PVC downpipe
Accessories Anchor bolts, high-strength bolts, screws, sealant, fans, skylight panels
Surface treatment Painted or hot-dip galvanized
Standards GB, ASTM, DIN, JIS, AISI, BS
Certification ISO 9001, CE
Design Free design; foundation and installation drawings included
Erection Worldwide construction service; or supervised local contractor
Lead time 30 days after deposit
Production capacity 15,000 tons / month
Packing Steel pallets and containers
Place of origin Chengdu, Sichuan, China
HS Code 9406000090 / 7308900000 (confirm with forwarder)
Frequently Asked Questions
What is included in a turnkey contract?
Design, fabrication, cladding and accessories, shipping, and erection by our crew or under our supervision. Land, foundations, utilities and permits stay with the client.
Do you erect buildings outside China?
Yes. We have built steel structures overseas. For clients who prefer a local contractor we supply drawings, an assembly sequence and technical supervision.
Is the design really free?
Yes. Plan, elevations, sections, foundation and installation drawings are provided at no cost. Where local engineering stamps are required, we work with your engineer.
Who builds the foundation?
The client, as civil works. We provide the foundation drawing and the anchor bolt layout, and we supply the anchor bolts.
Which steel standards do you work to?
GB, ASTM, DIN, JIS, AISI and BS. Common grades: Q235, Q355, A36, A572 Gr.50, A992, S235JR, S355JR and S460NL.
Can you supply European sections such as IPN or HEA?
Yes. IPE, IPN, HEA, HEB, HEM, UPN and UPE sections are available cut to length, with weights quoted per metre.
Recommended Products