| MOQ: | 1 PCS/20 Tons |
| Price: | $1300-3000 |
| Standard Packaging: | Customized based on project |
| Delivery Period: | 30-60 Days |
| Payment Method: | T/T,L/C,D/A,D/P |
| Supply Capacity: | 15000 Tons |
A warehouse that can be taken down and put up again somewhere else — which is what export processing zones tend to ask for. These buildings are framed in Q355B or Q235B steel with bolted or welded connections, span the full width without internal columns, and are packed and shipped as labelled components ready for erection.
An export processing plant usually has a lease, a policy window and a product mix that can all change. So the building is designed to change with them — sections can be added, the layout modified, or the whole structure dismantled and relocated.
The building supplies secure, enclosed storage for raw materials and finished goods, protects them from rain, sun and snow, and carries overhead loads such as a crane where the process needs one. Material handling flows through the free floor.
The frame is 100% recyclable and steel does not lose quality when it is recycled. At the end of the building's life the structure has scrap value rather than disposal cost, and it counts as recovered material rather than waste.
Skylights can be worked into the roof for natural light, which cuts daytime lighting load in a large storage floor.
Export projects often name a standard rather than a grade, and the section has to match it. We supply hollow sections and structural steel to several:
Square and rectangular hollow sections run from 50×50×3 mm up to 400×400×16 mm, in stock lengths of 6–12 m. Tolerances to EN 10034, ASTM A6/A6M or EN 10210, depending on the standard specified. Sizes outside the list are made to order.
Columns are kept out of the interior, so the full floor is usable for storage or the process line. Where office or extra storage space is needed, a mezzanine can be added in part of the building or across the second level.
The frame is protected against corrosion by galvanizing, and steel does not rot, burn the way timber does, or provide anything for pests to eat. The building is designed for the wind, snow and seismic load at your site, not a default.
Components are packed so they arrive ready to lift rather than sorted on site:
Detailed installation drawings are supplied with every building. Where a project needs it we send an engineer to supervise erection on site, or use our overseas installation team. Site supervision is quoted separately — the buyer covers visas, air tickets, accommodation and wages.
Send these and we return a layout drawing, the section sizes and a price.
Production runs about 20–30 days depending on building size and complexity. Monthly capacity is 3,000 tonnes. Sea, air or land transport as the goods and the site require.
| Item | Specification |
|---|---|
| Product | Recyclable prefab steel structure warehouse for export processing |
| Type | Light steel structure |
| Main material | Q355B / Q235B structural steel |
| Hollow sections | Square / rectangular 50×50×3 mm – 400×400×16 mm; 6–12 m lengths |
| Standards available | EN 10210 (S235/S275/S355 JR/J0/J2); ASTM A36/A572 Gr.50/A992/A500/A588; AS 4100; JIS SS400 |
| Tolerances | EN 10034:1993 / ASTM A6/A6M / EN 10210 |
| Connection | Bolted or welded |
| Clear span | Column-free interior |
| Dimensions | Length, width and height customizable |
| Mezzanine | Optional — office or extra storage |
| Corrosion protection | Galvanizing; corrosion-, fire-, pest-resistant |
| Features | Anti-corrosion, earthquake resistance, easy to install, fully recyclable |
| Recyclability | 100% recyclable at end of life |
| Skylights | Optional, for natural lighting |
| After-sales service | Designing, fabrication and installation |
| Installation | Drawings supplied; overseas engineer/team on request (buyer bears travel costs) |
| Packing | Steel pallet packing (bracket + banded bundle); small parts in cartons/crates |
| Delivery time | 20–30 days (by size and complexity) |
| MOQ | 100 m² |
| Place of origin | Chengdu, Sichuan, China |
| HS Code | 7308900000 |
Yes. The frame is bolted and factory trial-assembled, so it can be dismantled, shipped and re-erected. Welded frames are also possible where relocation is not a concern.
Yes. EN 10210, ASTM (A36 / A572 Gr.50 / A992 / A500 / A588), AS 4100 and JIS SS400 are all available, with tolerances to the matching standard.
Yes — square and rectangular hollow sections from 50×50×3 mm to 400×400×16 mm, in 6–12 m lengths. Other sizes are made to order.
Yes, where the process needs overhead lifting, but the crane load must be designed into the frame from the start.
Yes, in part of the building or across the second level.
Steel pallet packing — components bundled onto welded channel/angle brackets with rubber or timber separators, banded with steel wire, into a rectangular block for hoisting and container loading. Small parts in cartons or crates.
Products are checked at each stage — raw material, work in progress, tested materials and finished goods.
About 20–30 days, depending on building size and complexity.